Vane Minerals mineral exploration and development company with a current portfolio of interests in the United States focused on copper porphyry discovery, uranium exploration, and gold and silver production in Mexico. [1]

Contents

News

Copper Exploration

Porphyry copper exploration with targets located in southern Arizona and south west New Mexico.

Copper-map.jpg

Current Progress

Site Location Status Results
Yuma King Arizona Drilled Negative
Granite Gap New Mexico Drilled Negative
Peg Leg Arizona Permit Granted Negative
McGhee Peak New Mexico Diamond Drill Permitting In progress
  • A diamond drilling programme of 6 holes spaced 6-weeks apart is planned for McGhee Peak to begin late June/early July 2012
Railroad New Mexico Drilling In progress
Lone Hills New Mexico Permit Granted 2012
Cherry Creek New Mexico Permitting 2013
Bouse Arizona Permitting 2012

Additional targets are also in the pipeline, with plans to drill one target per quarter.

Uranium Exploration

Uranium exploration and development with projects in northern Arizona and Utah.

Uraniumassets.jpeg

Projects

Wate Breccia Pipe

Wate is the first breccia pipe moved into the development stage with partners Uranium One. The inferred resource consists of 1.118M lbs eU3O8 contained in 71,000 tons averaging 0.79% eU3O8. This was independently validated by SRK Consulting Inc. The Wate Pipe could advance rapidly from resource estimate to underground exploration and development planning within a six-to-twelve month period without further confirmation drilling.

The next stage would involve a Phase I program of a scoping study and preliminary economic assessment NI 43-101 technical report, in a 4 to 6 month period at an estimated cost of US$200,000. A Phase II program, contingent upon positive results from Phase I, would be the development of a 1500 ft exploration shaft, several sub-levels for drill stations, underground exploration drilling, surface facilities to support the underground efforts and a pre-feasibility level study, for a total cost of Phase II work of $27.8 million over an 18 to 24 month period.

Rose Breccia Pipe

The Company has completed three deep holes on the project indicating very encouraging results. Two of the three holes completed encountered +1% grade uranium mineralisation confirming previous historic drilling results at those grades. However, Hole 11-R-2 encountered an interval with a radiometric grade average of 16.45% eU3O8 with a maximum of 47.88% eU3O8, which is a substantially higher radiometric grade than had previously been encountered on any of the VANE breccia pipe projects.

The drill hole results, combined with data from previous drilling indicates that the pipe centre is easterly from all holes drilled to date. The +1% eU3O8 intervals in holes 11-R-2 and 11-R-3 are at the same depth (+/-1435ft) and approximately 60ft apart horizontally. Additionally, the current drilling verifies +1% eU3O8 mineralisation over a horizontal distance of 100ft and a vertical extent of 250ft when incorporating historic drilling. The vertical extent of mineralisation at grades 0.05% eU3O8 and higher has been increased to over 700ft. The mineralised intervals have been encountered over significant distances that, if continuous, would be sufficient to develop economic resources. Additional drilling is required to prove the continuity of the ore-grade mineralisation to establish NI43-101 compliant resources. The drilling programme is continuing with a view to establishing a resource.

Uranium One 50/50 Joint-Venture

"Under the terms of the agreement with U1, VANE will manage the exploration of the Rose project and all expenditures will be shared equally with U1. Upon outlining a 1.0 million pounds eU3O8 NI43-101-compliant resource, VANE will make a cash payment of US$250,000 to U1. U1 will then assume management of the project and upon securing a mineral lease from the State of Arizona, VANE will make a final payment of US$250,000 to U1 in order to acquire a 50% interest in the Rose Project. The Rose Project is operated separately from the existing VANE-U1 joint venture. "

Gold and Silver

Income from Au and Ag production in Mexico helps finance exploration activities.

Goldsilver.jpeg

Gold/Silver Production

Rosario Joint Venture Terms

Directors